Village of Alamance

Goals

1 Year Goal (2025):

Identify the current status of the water and sewer fund and contractors, identify succession planning, and decide on future changes needed.

5 Year Goal (2029):

Identify all existing water and sewer infrastructure and road right-of-ways and establish maintenance plans.

10 Year Goal (2034):

Remain property tax rate neutral while improving services and creating a solvent operational water and sewer fund.

Cotton Divider

Village of Alamance

Policies

Yard Waste Policy

Yard Waste Policy (CHANGES ARE IN RED)

Yard waste pick-up is provided every other week.

Limbs no longer than 4 feet in length or 6 inches in diameter will be picked up.

Please make piles in 4x4x4 (4ft wide, 4ft tall, 4ft long)

Grass clippings and leaves must be bagged, with a maximum of 15 bags per pick up.

No stumps or tree trunks will be collected.

Piles may not exceed 1.5 cubic yards.

A maximum of four (4) piles of yard waste will be collected per property during each scheduled pick-up.

Any piles exceeding four (4) will be subject to a fee of $25.00 per pile for each additional pile collected. Such charges shall be billed to the property owner.

All items must be placed on the curbside on the designated day of pick-up. Please do not set out more than 3 days in advance of pick up.

Should a resident violate any section of this policy, the administration will send a letter notifying the resident of the violation and ask to remove the yard waste as soon as possible. Failure to comply may result in the suspension of yard waste collection services until the violation is corrected

The Town Administrator may schedule a special yard waste pick-up day after storms. The limits for a special pick up will be suspended.

Bulk pick-up policy

  • Bulk pick-up is provided every other month.
  • No used motor oil or oil-based paints will be picked up.

UTILITY POLICY

Utility Policy:

The Villages water bill due date will alternate between the 3rd and 4th Wednesday of each month. All residents who purchase water and/or sewer services from outside the corporate boundaries of the Village will pay double the standard rate for these services. A leak report will be conducted monthly, and residents will be notified of any potential leaks. Whether a water leak occurs on a resident’s property or an excessive amount of water is consumed, an adjustment may be made based on the data log information. Water usage/consumption will be billed at the 2nd tier water rate. Pool fills are no longer considered excessive use, meaning adjustments to pool fills are no longer offered. This is only for water leaks that are three times the average bill.

The Village of Alamance will send a signed letter no later than one week before a potential water cut-off, stating the Village’s intent to disconnect a resident’s water, along with the date of disconnection. The Administration will follow up with a phone call no earlier than three days before the potential water disconnection to inform residents of the Village’s intent to disconnect water services. A door hanger will be left on the residents’ door to notify them of the disconnection once it occurs.

YARD MAINTENANCE POLICY

CODE ENFORCEMENT PAY SCALE FOR YARD ABATEMENT SERVICE
The Village of Alamance

The below pricing is for code enforcement lawn landscaping privately owned that has been left unattended for a said period which is in violation of the Village of Alamance and their policy. Pricing includes mowing with a lawn tractor or a utility tractor with a bush hog, trimming of grass, picking up limbs, pictures before and after, and reports of condition.

After inspection of the property, Russel Saxon will determine the type of mower that will be needed. Anything over the height of 9 inches will require a large tractor with a bush hog to be determined after inspection.

The Village of Alamance will calculate the square footage that is required to be cut and communicate this to Russell Saxon prior to his inspection. Rates are based on a three-hour maximum time allotted per property. Over three hours of work requires an additional charge of $60 per hour billed in conjunction with other identified charges.

LAWN TRACTOR, WEEDEATER, BLOWER
Per acre- $0.40 per 100 sq. ft.
Per ½ acre- $0.68 per 100 sq. ft.
Per 1/3 acre- $0.96 cents per 100 sq. ft.

UTILITY TRACTOR WITH BRUSH HOG, WEEDEATER, BLOWER
NINE INCHES OR HIGHER
Per acre- $0.63 per 100 sq. ft.
Per ½ acre- $1.26 per 100 sq. ft.
Per 1/3 acre- $1.89 per 100 sq. ft.

If chainsaws are required and or removing debris from the location, this will be billed on an hourly rate of $60 per hour plus all dump fees associated.

-Russell Saxon
Dba Accessible Outfalls

PUBLIC INFORMATION REQUEST POLICY

All public information requests will have to fill out the FOIA form attached to the Village website and pay any applicable fees.

 

Please click here to find the FOIA form. 

STORM DRAIN POLICY

VILLAGE OF ALAMANCE

STORM DRAINAGE POLICY

 

  1. General
  2. The Village of Alamance accepts all maintenance responsibility for storm drainage within its legal right-of-way. The Village does not have the authority to mandate storm drainage controls on private property beyond State and Federal laws. Currently, these laws govern watershed protection and civil liability issues. The Village does not attempt to undertake these measures until such time as State or Federal law permits.
  3. The Village acknowledges the fact that all storm water control structures are subject to their own operating parameters. In general, a properly functioning system transmits storm water downstream in a reasonable time, in a safe manner, and with no permanent property damage; all with respect to the nature of the storm event.
  4. The Village further acknowledges that yard flooding is a necessary part of storm drainage events. The Village generally seeks to improve drainage ways only when these areas are subject to unsafe conditions (prolonged ponding), recurring erosions, or property damage, as determined by the Village Engineer.
  5. The property owner is, at all times, expected to maintain the system for which they are a part.

 

  1. Purpose
  2. The purpose of this policy is to endorse sound management practices and encourage responsible development.
  3. Establish procedures for the installation of new storm drainage systems within proposed development; existing developed areas; to establish maintenance responsibilities of storm sewer systems including drainage ditches, open channels, streams, and other measures conveying storm drainage; and to establish design standards for storm drainage systems.

 

  1. Proposed Development
  2. Proposed storm drainage improvements within the corporate limits of the Village of Alamance for residential, commercial, industrial or institutional uses shall be at the expense of the developer and or property owner(s) and shall be done in accordance with Village standards and policy.

 

  1. Existing Systems
  2. Areas within the corporate limits of the Village developed prior to the adoption of this Storm Drainage Policy are subject to the following:
  • Drainage systems currently exist on Village maintained streets and North Carolina Department of Transportation (NCDOT) maintained streets. NCDOT policy shall apply to NCDOT maintained streets.
  • Existing storm drainage systems previously installed on private property may not meet current design standards. The Village assumes no responsibility to replace or repair such systems.
  • The Village will take any action reasonably necessary to mitigate the effects of storm drainage systems within its right-of-ways onto adjacent property. The Village offers citizen’s assistance with drainage improvements on private property by extending public storm sewer pipes on private property as follows:
  1. Upon receiving a written request from a property owner(s) the Village staff will determine if the request is eligible for Village participation. If the proposed project is determined to be eligible, preliminary plans and cost estimates for the project will be completed by Village staff and the most appropriate method of addressing the problem will be discussed with the owner(s).
  2. If property owner(s) and the Village are in agreement to proceed with project, an Agreement will be prepared by Village staff. The Village will authorize staff to proceed with preparation of plans and specifications for project upon receipt of payment from property owner(s) in the amount of 50% of the estimated project costs.
  3. Upon receipt of plans and specifications, the Village will procure bids for the proposed improvements. Prior to award of contract, Village will inform property owner(s) of cost of improvements and modify Agreement to reflect any necessary adjustments in cost based on bids received.
  4. In the event that more than one property owner is involved in a storm drainage project, the cost for each property owner shall be determined by dividing the total cost for the project by the total footage of property owners adjoining the proposed system and multiplying the resultant by the footage of property of each individual owner ([footage of each owner divided by total footage] x total cost) unless otherwise agreed prior to installation.
  5. The Village reserves the right to refuse to participate in any project that is determined to be excessive in cost or of limited benefit as a storm sewer improvement measure.
  6. Storm sewer systems crossing private property which do not carry storm water from existing streets dedicated for public street purposes and accepted for maintenance by the Village shall be the sole responsibility of the property owner and the Village will not participate in the installation of said storm sewer systems.
  7. Property owner(s) will provide to the Village, without cost, a legally executed document to allow the Village permission to enter, cross, install and maintain storm sewer system improvements. The property owner(s) will be responsible for the removal of any trees, shrubs, fences or other encumbrances that would impact the performance of the work. Permanent easements shall be provided to the Village by the property owner(s) to allow future maintenance of proposed improvements. The permanent easements shall be recorded at the Register of Deeds office.
  8. The minimum distance in which the Village will participate in the installation of storm sewer systems will be the distance required to extend from one property line to another property line of the same lot. Any shorter distances than that required to traverse one lot must be deemed feasible by the Village prior to Village participation. Any application for the installation of storm drainage systems within several lots must be signed by 100 percent of the affected property owners within the proposed project area.
  9. All pipe sizes, stabilized channels, structural accessories, discharge points, and other specifications shall be as determined by the Village. All materials for the project shall be as determined necessary by the Village.

 

  1. Maintenance Responsibilities
  • Maintenance of all storm sewer systems that collects storm water runoff in public streets maintained by the Village shall be the responsibility of the Village. The Village will also maintain storm sewer systems between public maintained streets  provided the improvements are within a publicly dedicated street or easement of sufficient width to provide maintenance activities (minimum width of 15-feet).
  • Maintenance of all other storm sewer systems upstream of public streets shall be the responsibility of the property owner(s) regardless of whether an easement has been dedicated to public use.
  • Maintenance of all grass lined swales, drainage ditches, streams or other storm water measures beyond the discharge point of street storm sewer pipes, and associated rip rap, concrete or other velocity reduction measure shall be the responsibility of the property owner(s).
  • Maintenance of driveway pipes and street ditches are the responsibility of the property owner(s).

 

  1. Design Standards
  2. New and extended storm drainage systems shall be designed to accommodate a ten-year design storm frequency (a storm event which has a 10% probability of occurring in any one given year). The storm drainage system to be extended shall convey the discharge of the upstream drainage area. The discharge shall be calculated based on total upstream area and fully developed conditions.
  3. Storm drainage systems which connect to or subject to approval by North Carolina Department of Transportation (NCDOT) shall comply with NCDOT standards. Storm drainage systems downstream of NCDOT pipes or structures shall be designed to accommodate the design storm of the existing upstream NCDOT pipe or structure.
  4. Plans and specifications for new and extended storm drainage systems shall be prepared by a professional engineer, surveyor or landscape architect and in accordance with the above design storm frequency. NCDOT standard detail drawings and specifications shall serve as the basis for the preparation of plans and specifications and may be modified as approved by the Village Engineer.
  5. Storm drains shall discharge storm water runoff at or near the rear property line of a lot. A headwall or flared end section shall be provided at the release point of all pipe systems plus an appropriate energy dissipater shall be provided, designed to meet North Carolina Department of Natural Resources, Land Quality Section requirements.
  6. The following is a list of minimum design requirements for storm drainage pipe lines that will be maintained by the Village of Alamance:
  • Minimum pipe size for storm drainage shall be 15” in diameter.
  • Minimum pipe grade for storm drainage shall be 0.5% and the maximum pipe grade shall be 10%.
  • All materials and methods of construction shall be in accordance with NCDOT requirements.
  • Drainage Easements shall be dedicated to the Public and the minimum widths shall be as follows:
  1. 15”-30” pipe diameter shall be 15-feet.
  2. Greater than 30” pipe diameter shall be 30-feet.
  3. Village Engineer may require greater widths where the depth (finish grade to invert) exceeds 8-ft.
  4. All proposed development that is adjacent to or is traversed by a drainage way or storm drainage system which has a contributing drainage area of more than 5.0 acres, shall adhere to the following requirements:
  • Provide a flood study, prepared by a professional engineer, for the project prior to approval of construction plans. Methodology used by Developer’s Engineer shall be approved by Village Engineer prior to preparation of Flood Study.
  • Discharge for Flood Study shall be based on the 100-year design storm frequency (a storm event which has a 1% probability of occurring in any one given year), and shall be based on a fully developed upstream drainage area.
  • In piped drainage systems, the 100-year discharge flow shall not overtop the street or roadway.
  • All proposed finish floor elevations shall be at least 2-feet above the water surface elevation during the 100-year design storm event.
  • A drainage easement of sufficient width as determined by the flood study shall be dedicated and shown on Final Plat for the project. In addition, water surface elevations shall be shown on the plat as determined by Flood Study.

 

 

Please click here to find the STORM DRAIN ADOPTION  